-
Russ Cox authored
In the tests, the runtime test fails after 2 minutes. On an unloaded VM it only takes 45 seconds. I think the difference is all the other build work going on simultaneously with the running of the runtime test. Change-Id: I41e95d2e4daea44ceaa8505f81aa7b5bcfa9ec77 Reviewed-on: https://go-review.googlesource.com/6364Reviewed-by: David Crawshaw <crawshaw@golang.org> Reviewed-by: Minux Ma <minux@golang.org> Reviewed-by: Alex Brainman <alex.brainman@gmail.com>
0aac9bb8